  • Construction of 10,700 m2 new terminal
  • 70% increase in the number of check-in counters (from 7 to 12)
  • Doubling of the number of security lanes (from 2 to 4)
  • Installation of modern baggage handling system
  • Doubling of the number of departure gates (from 3 to 6)
  • Construction of new wastewater treatment plant
  • Construction of new fire station and new access control guardhouse in the aircraft area
  • Refurbishment of the air traffic control tower
  • Refurbishment of the airside pavement
  • Reconfiguration of the aircraft parking area10. Expansion by 10,350 m2 and reconfiguration of the apron

Stakeholder engagement meetings
In an event held on May 9th 2018 in Kefalonia, Fraport Greece presented to the local community, representatives of local authorities, local tourism stakeholders and local media its analytical construction plans for the development of Kefalonia airport. In the context of taking over the management and operation of the 14 regional airports on April 11th, Fraport Greece held a round of nationwide stakeholder engagement events during which Fraport Greece presented its plans for all airports.

During the Q&A session the key issues that emerged regarding the Kefalonia airport were the following:
• Development of baby changing facilities
• Refurbishment of the runway
• New information desk
• Establishment of regular meeting with stakeholders
• Timeline for new airport
• Airport Naming and artwork from old terminal building.